SL NO. |
Description |
Expected Data |
||||
1
|
District and upozila under Rajshahi Distribution zone |
Total 8 district and 19 upozila |
||||
Total no. of customer (Till Oct 2016) Rajshahi |
7,11,128( Seven lakh eleven thousand one hundred twenty eight) 60% |
|||||
Total no. of customer (Till Oct 2016) Rangpur |
4,80,259(Four lakh eighty thousand two hundred fifty nine) 40% |
|||||
Total |
11,91,387 |
|||||
Difference |
2,30,859(Two lakh thirty thousand eight hundred fifty nine) |
|||||
2 |
Average Import Unit Per Month |
145-184 Mkwh Av-161(sixteen corer one lakh unit) |
||||
3 |
Average Sold Unit Per Month |
128-159 Mkwh Av-140(fourteen corer unit) |
||||
4 |
Average Billed Amount Per Month |
764-960 Mtk Av-862(Eighty corer two lakh taka) |
||||
5 |
Average Collected Amount Per Month |
796-912 Mtk Av-854(Eighty fife corer taka) |
||||
6 |
Target of Sys. Loss & Achieve Up to FY-2015-16(June/2016) |
T=10.92%, A-10.62% |
||||
7 |
Equivalent Bill Month FY-2014-16 |
2.46 |
||||
8 |
Target CI Ratio & Achieve FY-2014-16(June2016) |
T=92.13%, A=86.88% |
||||
|
Target CI Ratio & Achieve FY-2016-16-7 |
T=91.04% |
||||
9 |
Connected consumer number of last 7 years (Dec/2009 April/2016 |
682790-384788=2,98,002( Two lakh ninety eight thousand) Cont Load= 1200-564=636MW |
||||
|
Consumer growth rate |
7% |
||||
10 |
Pending bill of city corporation till June 2016 |
22,54(Twenty two corer fifty four lakh) Pending bill equal month 42.34 till June2016 |
||||
11 |
Rajshahi Wasa |
On 31.07.2011 City Corporation water pumps was handover to WASA by BDT. 8,49,50,000. Current credit BDT. 1228.19, which is equivalent of 3.20 months. |
||||
12 |
Highest Load in 2014 |
780 MW ( BUB 310 MW and POBIS 470 MW) 30/03/014 |
||||
|
Highest Load in 2015 |
853 MW (BUB 314 MW and POBIS 539 MW 10/10/15) Increase 2.00pm73 MW |
||||
|
Highest Load in 2016 |
983 MW (BUB 380 MW and POBIS 719 MW 19/10/16) 19.30 |
||||
|
BUB highest demand on 2015 |
350 MW |
||||
|
Highest Load taken in Rajshahi on 2015 |
87 MW, On 2014 was 70 MW Increase 17 MW |
||||
|
Rajshahi metro present |
BUB 87MW 2014 was 70 MW Total 137 MW |
||||
13 |
Average load shedding |
0 Free from load shedding |
||||
14 |
No. 33 KV feeder
|
29 |
||||
15 |
No. 11 KV feeder
|
155 |
||||
16 |
Length of distribution line |
|
||||
|
|
33 KV Line |
400 Km |
|||
|
|
Distribution 11KV Line |
2281 Km |
|||
|
|
Distribution 11/04 KV Line |
1605 Km |
|||
|
|
Distribution 0.4 KV Line |
3143 Km |
|||
|
|
Distribution 0.2 KV Line |
385 Km |
|||
|
|
Total |
7814 Km |
|||
17 |
33/11 KV sub-station number and capacity |
29 Capacity-635/838 MVA |
||||
18 |
Distribution transformer number and capacity |
4133, 647140 KVA |
||||
19. |
Number and load of pumps under Rajshahi zone |
PDB=5721, REB=6500MW Total=70621 Load PDB =50MW, REB =200 MW Total=250 MW
|
||||
|
Deep tube-well (average 18-29.5 Kw) |
PDB =1101, REB =15,844 Total =16945 Load PDB =25 MW,REB =123 MW Total =150 MW
|
||||
|
None deep tube-well (average load 5-8 Kw) |
PDB =3649, REB =48,188 Total =51,837 Load PDB =22 MW,REB =58 MW Total =80 MW
|
||||
|
Low-lift pump (average 10Kw) |
PDB =388, REB =968 Total = 1356 Load PDB =3 MW,REB =19 MW Total =80 MW
|